Monthly Archives: November 2011

26th November 2011 – We have lockup at No. 36 A brickie for No. 40 (Just)

I don’t recall ordering a pool. Glazing complete – Lockup Reached No. 40 can finally see some progress (only just though) A small cnr of the house has been bricked, so we are hoping we don’t lose the brickie again … Continue reading

Posted in Uncategorized | Leave a comment

18th November 2011- Plastering nearly completed

No. 36 has temp doors at the front, so we are approaching lockup quite quickly. The plasterers have been hard at it and look like finishing in a week or so. Master floors have been in touch & confirmed that … Continue reading

Posted in Uncategorized | Leave a comment

11th November 2011 Brickwork nearing completion

No Progress at No. 40…. Maybe next week There continues to be heaps of progress at No. 36 but nothing happening at No. 40. Still waiting on brickie to finish the Riverside Manor, which apparently only has a couple of … Continue reading

Posted in Uncategorized | Leave a comment

4th November 2011 – Lots of Activity this week

These retainer walls are starting to look like something we can work with. No. 40 has a roof & a view. It has been a very busy & productive week for Roseleigh’s trade’s, considering it is cup week we anticipated … Continue reading

Posted in Uncategorized | Leave a comment

20th August 2011 Damn Retainer Walls

Engineers & Council Covering their butts with over the top “engineered retainer walls”:

Posted in Uncategorized | Leave a comment

28th October 2011 – Progress that can’t be seen:

It’s a frame for No. 40 Looking up the driveway from No. 40 Brickie is working hard at No. 36 & the frame is just about finished at No. 40. The gutter and fascia has also started at No. 40. … Continue reading

Posted in Uncategorized | Leave a comment

21st October 2011 – Lot’s of Progress for everyone!!

Frame nearly complete for No. 40 The brickie is hard at it at No. 36, and the top floor frame is well on its way at No. 40. The brickie is a local guy and typical of most of Roseleigh’s … Continue reading

Posted in Uncategorized | Leave a comment

14th October 2011 – Ahh we are progressing!

Ahh frame at last. The beginnings of a roof for No. 36, very exciting, we can now get out of the rain. The ground floor frame has started at No. 40, even more exciting than a roof for No. 36. … Continue reading

Posted in Uncategorized | Leave a comment

17th October 2011 – Site meeting with TC re Front Verandah – Did you know that Paving is concrete?

We do now! Had site meeting with TC as we are very concerned about the bad attempts to rectify the concrete piers for the front verandah. Somebody, we don’t know who, made a gross miscalculation for the front of the … Continue reading

Posted in Uncategorized | Leave a comment

9th October 2011 – Seems to be a problem with Verandah Piers

This is probably the most serious concern we have to date. The concrete piers on the verandah are far to low. Suspect that the site cut wasn’t done correctly, putting the whole verandah & bay window out of whack…… that’s … Continue reading

Posted in Uncategorized | Leave a comment